750 kW Solar PV Scheme

A rooftop solar installation for transport operator FDC Holdings, cutting energy costs and carbon across their central distribution hub.

Solar array on a large industrial roof seen from above with the town skyline beyond

The problem

With a fleet of 120 vehicles and rising energy costs, FDC wanted to cut bills and emissions, targeting a 30% reduction in energy costs and 20% in emissions over five years, while strengthening its sustainability credentials.

The solution

We installed a 750 kW PV system on the roof of their central distribution hub, generating around 900,000 kWh a year and cutting reliance on grid electricity. Tier-1 Aiko panels and SolarEdge monitoring were specified for efficiency and reliability.

Delivery & results

Installed over two months with minimal disruption to daily operations. In the first year the system cut electricity bills by 35% and carbon emissions by 25%, while raising FDC’s profile with environmentally conscious clients.

Project facts
ClientFDC Holdings (transport)
System size750 kW rooftop PV
PanelsAiko: Bloomberg Tier 1
Generation~900,000 kWh per year
MonitoringSolarEdge
750 kWSystem size
900,000 kWhGenerated a year
35%Lower electricity bills
25%Carbon reduction

“Cornerstone’s performance was faultless, all works carried out on time and within budget while units remained occupied.”

FDC Holdings
Project gallery

FDC in pictures.

Photographs from site, from early works through to handover. Select any image to enlarge it.

Aerial view of a long solar PV array running the length of the FDC distribution warehouse roof
EnergyFDC
Drone view of solar panels on the FDC warehouse roof with the surrounding industrial estate
EnergyFDC
Close aerial view along rows of solar panels on the FDC warehouse roof
EnergyFDC

Let's talk about your next project.

One call reaches the whole group. Tell us what you need and we'll bring the right teams together.

Accreditations